How Long Does a Landscape Build Take in Sydney?
Published on 16 June 2026

The single most common question we get after 'how much?' is 'how long?'. The honest answer separates the design phase, the approval phase and the build phase — because each has its own timeline and only the build is fully in our control.
Design phase — 4 to 12 weeks
A courtyard design package is usually 4–6 weeks: site measure, concept, review, refinement, documentation. A larger project with pool, structural work and council approvals is usually 8–12 weeks of design before drawings are ready to lodge.
Approvals — 4 to 24 weeks
Complying Development (most pools and alfresco projects on standard blocks) typically takes 2–4 weeks. A full Development Application varies wildly by council — Woollahra and Mosman commonly run 4–6 months; Inner West and City of Sydney usually 3–5 months; Hills Shire and Northern Beaches usually 2–4 months for straightforward proposals.
Build phase — 6 to 26 weeks
A courtyard renovation is usually 6–10 weeks on site. A mid-size backyard with deck, planting and lighting is 10–16 weeks. A full rebuild with a pool, outdoor kitchen and structural retaining runs 18–26 weeks. Rain, access and structural surprises are the three things that most commonly extend a schedule.
The projects that finish on time are almost always the ones that finished design and approvals before they started digging.
How we plan a realistic date
We give clients three dates up front: design complete, approvals lodged, and estimated site completion. Each has a contingency built in, and we update them at the end of every phase — so the finish date is never a surprise.
Can you compress the timeline?
Design and approvals can rarely be rushed without cutting corners we would not stand behind. But long-lead items (custom stone, imported tile, pool equipment) can be ordered during the approval phase so they are on site the week construction starts — that alone often saves 3–4 weeks.